Check a hire charge when extra days hit the weekly cap

A hire quote may charge at least one week, then cap extra-day fees at the next weekly price. Use this check only when that exact model is agreed for one item. It shows where the partial-week cap changes the amount before you prepare or query an invoice.

Try the invoice tool now →

Start without signing in. Free use has branding and usage limits. Review optional plans against actual needs.

Check your agreed rates

Prefilled values are fictional. Replace them before use. Do not enter personal or payment details.

Confirm the charging model, then calculate.

Inputs are calculated in this page; this checker does not upload or save them. Your browser may restore fields. Existing page analytics is separate.

Worked example: the fifth extra day reaches the cap

Fictional rates: A$400 per seven days and A$90 per additional day. For 12 billable days: one complete week is A$400; five extra days would be A$450, capped at A$400. The calculated hire-only total is A$800. A proposed A$850 is A$50 higher under this model. These are invented demonstration amounts, not a supplier quote or a customer bill.

Billable daysFull blocks / minimumExtra daysHire only
110A$400.00
710A$400.00
811A$490.00
1114A$760.00
1215A$800.00
1420A$800.00
1521A$890.00

Download bilingual worked cases (CSV)

How the calculation works

For 1–7 confirmed billable days, use one weekly fee. Above seven days, count complete seven-day blocks and price them at the weekly rate. For the remaining 1–6 days, use the smaller of the entered extra-day sum and one weekly fee. Add both parts. The difference is the proposed hire-only amount minus that result. Money is calculated in integer cents, so this check does not round daily totals repeatedly.

Check these boundaries first

Turn the checked amount into a clear invoice line

Match the period, equipment and rate card to the job records. Resolve any difference with the other party. If you are the supplier, manually enter only the agreed description and amount in the invoice tool, review GST settings and the customer preview, then export. The checker does not change drafts, import rental records or issue credits.

Fictional description: equipment hire, 12 agreed billable days; 1 week A$400 + partial-week cap A$400. Quantity 1; hire-only line A$800 before any separately confirmed tax or extras.

Try the invoice tool now →

Start without signing in. Free use has branding and usage limits. Review optional plans against actual needs.

Different questions need different checks

Sources and review

Zedflo’s Australian hire page provides a concrete example of a seven-day minimum with extra-day charges capped by a weekly price. Kennards describes different extra-day pricing, showing why the actual agreement matters. This tool uses your entered rates, not live supplier prices. Sources support the charging problem, not endorsement or measured search demand.

Zedflo — P117 hire · Kennards — rates and payment

Reviewed 31 October 2026.

Questions before use

Is a week always seven billable days?

No. This checker supports that specific agreed model only. Confirm the supplier’s counting rules before entering whole billable days.

Does the result add GST or create an invoice?

No. It compares hire-only amounts on the same tax basis. You decide the correct tax treatment and manually create any customer document separately.